The charger is one part of the load
A Level 2 charging plan begins with the vehicle, charging equipment, desired charging speed, and the home’s existing electrical loads. The panel label or service rating alone is not a complete capacity review.
An upgrade is not automatic
Field verification may support the planned circuit as proposed, identify a different equipment setting or control approach, or show that service changes are needed. The appropriate path depends on compatible equipment and documented load conditions.
Confirm the complete installation
Ask the electrician to address circuit routing, charger or receptacle type, mounting location, equipment instructions, permitting, inspection, and any utility coordination. Final pricing should follow confirmation of those details.